ZeePedia

Appendix E: Solar Dimensioning:General Data, Component Characteristics

<< Appendix D: Cable Sizes
Glossary >>
img
Appendix E: Solar
Dimensioning
Use these tables to collect the necessary data to estimate the required size
of your solar energy system.
General Data
Site Name
Site Latitude (°)
Irradiation Data
Gdm(0), in kWh / m2 per day)
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Worst Irradiation Month
Reliability and System Operational Voltage
Days of Autonomy (N)
Nominal Voltage (VNEquip)
383
img
384 Appendix E: Solar Dimensioning
Component Characteristics
Solar Panels
Voltage @ Maximum Power (Vpmax)
Current @ Maximum Power (Ipmax)
Panel Type/Model and Power (Wp)
Batteries
Nominal Capacity @ 100 H (CNBat)
Nominal Voltage (VNBat)
Maximum Depth of Discharge (DoDMAX)
or Usable Capacity (CUBat)
Regulator
Nominal Voltage (VNReg)
Maximum Current (ImaxReg)
DC/AC Inverter (if needed)
Nominal Voltage (VNConv)
Instantaneous Power (PIConv)
Performance @ 70% Load
img
Appendix E: Solar Dimensioning
385
Loads
Estimated Energy Consumed by the Loads (DC)
Month of Greatest Consumption
# of
x Nominal
x Usage
= Energy
Description
Units
Power
Hours / Day
(Wh/day)
ETOTAL DC
Estimated Energy Consumed by the Loads (AC)
Month of Greatest Consumption
# of
x Nominal
x Usage
= Energy
Description
Units
Power
Hours / Day
(Wh/day)
ETOTAL AC (before converter)
ETOTAL AC (after converter) = ETOTAL AC / 70%
img
386 Appendix E: Solar Dimensioning
Finding the Worst Month
Site Name
Site Latitude (°)
Nominal Voltage of the Installation VN
(Month)
J
F
M
A
M
J
J
A
S
O
N
D
ß
Inclination
Gdm (ß) (kWh/m2
day)
ETOTAL (DC) (Wh/day)
ETOTAL (AC) (Wh/day)
ETOTAL (AC + DC)=
Im (A) = ETOTAL (Wh/day)
1
kW/m2/ (Gdm(ß) x VN)
Worst Month Summary
Worst Month
Im (A)
ImMAX (A) = 1.21 x Im
ETOTAL (AC + DC)
img
Appendix E: Solar Dimensioning
387
Final Calculations
Panels
Panels in Series (NPS)
NPS = VN / VPmax =
Panels in Parallel (NPP)
NPP = ImMAX / IPmax =
Total Number of Panels
NTOT = NPS x NPP =
Batteries
ETOTAL(WORST MONTH) /
Necessary Capacity
(CNEC)
VN x N
Nominal Capacity
CNEC / DoDMAX
(CNOM)
Number of Batteries
VN / VNBAT
in Series (NBS)
Cables
Panels >
Batteries >
Main Line
Batteries
Converter
Voltage Drop (Va - Vb)
Thickness (Section)
r x L x ImMAX / (Va - Vb)
mm2/m (for copper) and L is
For cable thickness computation, r = 0.01286
the length in meters.